Solar PV Case Study Colombier UK

Colombier UK

  • 17.02.26
  • James Pullin

Colombier UK installs a 264.36 kWp roof-mounted solar photovoltaic (PV) system at their paper supply facility in Sittingbourne, Kent.

Read More

Alitex Limited

  • 28.07.25
  • James Pullin

Alitex UK have taken a significant step in strengthening their commitment to sustainable operations by expanding their on-site solar generation.

Read More
CHEP Severnside Bristol Noble Green Energy Solar PV installation

CHEP Severnside Bristol

  • 08.07.25
  • James Pullin

CHEP has been working with Noble Green Energy to reduce carbon usage and cut electricity costs at their Bristol site.

Read More

CHEP Manchester

  • 03.07.24
  • James Pullin

CHEP has been working with Noble Green Energy to reduce carbon usage and cut electricity costs at their Manchester site.

Read More

CHEP Pontefract

  • 10.05.24
  • James Pullin

CHEP has been working with Noble Green Energy to reduce carbon usage and cut electricity costs.

Read More

Oadby Plastics

  • 10.05.24
  • James Pullin

Oadby Plastics were so happy with the performance of the Solar PV, the company decided to invest further.

Read More
Get in Touch