Solar PV Case Study Colombier UK

Colombier UK

  • 17.02.26
  • James Pullin

Colombier UK installs a 264.36 kWp roof-mounted solar photovoltaic (PV) system at their paper supply facility in Sittingbourne, Kent.

Read More
Noble Green Energy Solar PV at Lark Hall Farm

Lark Hall Farm

  • 07.01.26
  • James Pullin

Blenkiron Farming Co. installs a 398.4 kWp ground-mounted SolarEdge expansion for existing Solar PV and site-wide infrastructure at Lark Hall Farm.

Read More
P.D. Hook Hatcheries - Solar PV installation by Noble Green Energy

P.D. Hook Hatcheries – 3 Sites

  • 07.01.26
  • James Pullin

Noble Green Energy partnered with P.D. Hook to deliver scalable, site-specific solar PV solutions that align closely with on-site energy demand. Following the successful…

Read More

Alitex Limited

  • 28.07.25
  • James Pullin

Alitex UK have taken a significant step in strengthening their commitment to sustainable operations by expanding their on-site solar generation.

Read More

P.D. Hook Hatcheries

  • 28.07.25
  • James Pullin

PD Hook Hatcheries has taken a major step towards sustainability with a 100.05kWP roof-mounted solar PV system on their operation at Cowdown, Hampshire.

Read More
CHEP Severnside Bristol Noble Green Energy Solar PV installation

CHEP Severnside Bristol

  • 08.07.25
  • James Pullin

CHEP has been working with Noble Green Energy to reduce carbon usage and cut electricity costs at their Bristol site.

Read More

Tuesley Farm – Hall Hunter Partnership

  • 09.06.25
  • James Pullin

The Hall Hunter Partnership approached Noble Green Energy to expand their existing PV systems at Tuesley Farm, which already exceeded 400kWp.

Read More
Get in Touch